Group
|
Loc Name
|
Loc
|
Loc Purp
Desc
|
Loc/QTI
|
Loc Name
|
Loc
|
Loc Purp
Desc
|
Loc/QTI
|
Unsub Cap
|
Loc Zn
|
Eff Gas Day
|
Eff Gas Day Time
|
End Eff Gas Day
|
End Time Eff Gas Day
|
Comments
|
|
|
1
|
TCPL - Niagara
|
421079
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
207,323
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
10/31/2025
|
9:00 AM
|
Capacity through the Rose Lake meter. Actual capacity
dependent on compression availability. Any capacity subscribed from the paths
in Group 1 would reduce the unsubscribed capacity offered in all Group 4 and
20 paths.                                                                                  Â
|
|
|
102,323
|
FT/EFT
|
11/1/2025
|
9:00 AM
|
|
|
|
|
|
Capacity through Rose Lake delivery meters on rows 7, 9,
19, 22, 25 and 26 cannot be combined with capacity through the Rose Lake
delivery meter on row 1.
|
|
|
Transco - Wharton
|
6325
|
Delivery Location
|
DPQ
|
90,000
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
Capacity through
the Wharton meter. Actual capacity
dependent on compression availability.Â
Capacity through Wharton delivery meters on rows 14, 16, 17, 25, 26,
27, and 28 cannot be combined with capacity through the Wharton delivery
meter on row 1.
|
|
|
|
|
|
|
|
|
|
|
|
|
130,000
|
FT/EFT
|
11/1/2024
|
9:00 AM
|
|
|
|
|
|
TRANSCO – Leidy
|
7126
|
Delivery Location
|
DPQ
|
31,212
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2026
|
9:00 AM
|
Capacity remaining
from Open Season 300;Â Â
                                                                                 Â
|
|
|
|
|
|
|
26,000
|
FT
|
11/1/2026
|
9:00 AM
|
|
|
|
|
|
|
|
|
2
|
Empire - Wheatfield
|
012003015
|
Receipt Location
|
RPQ
|
NFGDC Dist City Gate - NY
|
NFGDC-NY
|
Delivery Location
|
DPQ
|
21,971
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining
from Open Season 210.
|
|
|
|
Empire - Grand Island
|
012003010
|
Receipt Location
|
RPQ
|
41,896
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining
from Open Season 236.
|
|
|
|
3
|
Empire - Pendleton
|
012003020
|
Receipt Location
|
RPQ
|
NFGDC Dist City Gate - NY
|
 NFGDC-NY
|
Delivery Location
|
DPQ
|
78,045
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Total receipt capacity
from TGP East Aurora, TCPL Niagara and Empire Pendleton with deliveries to
NFGDC – NY cannot exceed 78,045 Dth/d.
|
|
|
|
|
|
|
|
|
|
NFGDC Dist Line XM8
|
NFGDC-XM8
|
Delivery Location
|
DPQ
|
39,800
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
NFGDC Dist Vicksburg
|
NFGDC-VICK
|
Delivery Location
|
DPQ
|
12,240
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Remainder of OS247
|
|
|
|
4
|
TCPL - Niagara
|
421079
|
Receipt Location
|
RPQ
|
NFGDC Dist City Gate - NY
|
NFGDC-NY
|
Delivery Location
|
DPQ
|
78,045
|
EFT
|
Currently Avail
|
9:00 AM
|
12/31/2024
|
9:00 AM
|
Total receipt
capacity from TGP East Aurora, TCPL Niagara and Empire Pendleton with
deliveries to NFGDC – NY, NFGDC - XM8 & NFGDC - Vicksburg cannot exceed 78,045 Dth/d.    Any
capacity subscribed from the paths in Group 4 would reduce the unsubscribed
capacity offered in all Group 1 and 20 paths.                                                                                                                                                                                                                  Â
                                                                                                                   Â
|
|
|
|
|
|
|
|
|
|
|
|
TGP - East Aurora
|
420077
|
NFGDC Dist Line XM8
|
NFGDC-XM8
|
Delivery Location
|
DPQ
|
39,800
|
FT
|
Currently Avail
|
9:00 AM
|
12/31/2024
|
9:00 AM
|
Remainder of OS247
|
|
|
|
NFGDC Dist Vicksburg
|
NFGDC-VICK
|
Delivery Location
|
DPQ
|
12,240
|
FT
|
Currently Avail
|
9:00 AM
|
12/31/2024
|
9:00 AM
|
End date posted as
part of Non-Critical Notice ID #910138 Reserved Capacity for Northern Access
2016 project.
|
|
|
|
Actual capacity
may vary based on hydraulics and meter capacity associated with receipt point
request. Available capacity may also
depend on system compression.                                                                                            Â
|
|
|
|
5
|
Columbia - Hartzfelt
|
633863
|
Receipt Location
|
RPQ
|
Dresser Rand Company
|
DRESSEROLEAN
|
Delivery Location
|
DPQ
|
6,559
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 169.
|
|
|
|
Indeck Olean Limited Partnership
|
INDECKOLEAN
|
Delivery Location
|
DPQ
|
16,900
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
Saint Bonaventure University
|
STBONA
|
Delivery Location
|
DPQ
|
1,605
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
6
|
Empire - Pendleton
|
012003020
|
Receipt Location
|
RPQ
|
Wycatt - Ashford, NY
|
NSX9223491
|
Delivery Location
|
DPQ
|
3,698
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Delivery Quantity
may be less to certain receipt/delivery points.
|
|
|
|
TGP - East Aurora
|
420077
|
|
|
|
|
|
|
7
|
Transco - Leidy
|
7126
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
57,223
|
FT
|
Currently Avail
|
9:00 AM
|
6/30/2024
|
9:00 AM
|
Actual capacity may vary based on hydraulics and meter
capacity associated with receipt point request. Available capacity may also depend on
system compression. Capacity subscribed from Leidy will result in a reduction
of capacity from corresponding producer meters listed in row 7. Capacity
subscribed from a row 7 producer meter will result in a reduction of capacity
from Leidy. Any amount of capacity subscribed to the Empire - Tuscarora
Delivery Point in row 7 will reduce row 9 capacity offering deliverires to
Empire - Tuscaoras well as row 7 capacity offerings
to Rose Lake. Any amount of capacity subscribed to the Millennium -
Independence point in row 7 will reduce deliveries to Rose Lake in row
7.   Additional Capacity remaining
from OS 285Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
|
|
|
|
67,223
|
FT
|
7/1/2024
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
|
|
|
|
|
|
107,223
|
FT
|
11/1/2024
|
9:00 AM
|
3/31/2025
|
9:00 AM
|
|
|
|
132,223
|
FT
|
4/1/2025
|
9:00 AM
|
|
|
|
|
|
Millennium – Independence
|
2078
|
Delivery Location
|
DPQ
|
68,311
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Empire - Tuscarora
|
022009010
|
Delivery Location
|
DPQ
|
11,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
JKLM EnergyÂ
|
PSP3104594
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
65,723
|
FT
|
Currently Avail
|
9:00 AM
|
6/30/2024
|
9:00 AM
|
|
|
|
|
|
|
|
|
75,723
|
FT
|
7/1/2024
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
|
|
|
Seneca Resources Corp.
|
PSP1144491
|
115,723
|
FT
|
11/1/2024
|
9:00 AM
|
3/31/2025
|
9:00 AM
|
|
|
|
Penn. General Energy
|
PSP1144481
|
140,723
|
FT
|
4/1/2025
|
9:00AM
|
|
|
|
|
|
Empire - Tuscarora
|
022009010
|
Delivery Location
|
DPQ
|
11,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
8
|
TGP - East Aurora
|
420077
|
Receipt Location
|
RPQ
|
Niagara
|
421079
|
Delivery Location
|
DPQ
|
31,689
|
FT
|
Currently Avail
|
9:00 AM
|
11/30/2025
|
9:00 AM
|
Capacity remaining from Open Season 196. FT-S capacity is winter only, of which
30,625 dth/day has no primary term limitation and
the remaining 3,603 dth/day has a primary term
limitation of 19 months.                                                                             Â
|
|
|
|
|
|
|
34,228
|
FT-S
|
11/1/2024
|
9:00 AM
|
3/31/2025
|
9:00 AM
|
Capacity subscribed from Row 37 will impact the capacity
being made in Row 8. In addition, capacity subscribed from Row 8 will impact
the capacity being made available in Row 37
|
|
|
|
|
|
|
|
|
|
|
|
9
|
JKLM Energy
|
PSP3104595
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
144,000
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
Capacity remaining
from Open Seasons 203, 215, Offer 1, 229 , 246, 256,
258 270.
Actual capacity may vary based on hydraulics and meter capacity associated
with receipt point request.Â
|
|
|
|
JKLM Energy
|
PSP3104623
|
|
|
|
|
Penn. General Energy
|
PSP1U46481
|
164,000
|
FT
|
11/1/2024
|
9:00 AM
|
|
|
Capacity through Rose Lake delivery meters on rows 1, 7,
19, 22, 25 & 26 cannot be combined with capacity through the Rose Lake
delivery meter on row 9.
|
|
|
|
New Line YM52 Production
|
TBD
|
Capacity
subscribed from Wharton will result in a reduction of capacity from
corresponding producer meters listed in row 9. Capacity subscribed from a row
9 producer meter will result in a reduction of capacity from Wharton.    Â
|
|
|
|
Empire - Tuscarora
|
022009010
|
Delivery Location
|
DPQ
|
11,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
Transco - Wharton
|
6325
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
98,500
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
 Any amount of capacity subscribed to the
Empire - Tuscarora Delivery Point in row 9 will reduce row 7 capacity offering deliverires to
Empire - Tuscaora as well as row 9 capacity
offerings to Rose Lake.
|
|
|
|
|
|
|
118,500
|
FT
|
11/1/2024
|
9:00 AM
|
|
|
|
|
|
|
|
|
Empire - Tuscarora
|
022009010
|
Delivery Location
|
DPQ
|
11,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
|
|
10
|
TGP - Nashville
|
420243
|
Receipt Location
|
RPQ
|
NFGDC - Mineral Springs
|
NFGDC-MSMX
|
Delivery Location
|
DPQ
|
2,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 214, Offer 1.
|
|
|
|
|
|
|
|
|
|
11
|
Appalachian Production Zone 2
|
AppZn2
|
Receipt Location
|
RPQ
|
Clarion River Gas City Gate
|
CRGCG
|
Delivery Location
|
DPQ
|
140
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Certain receipt/delivery combinations may have limited
capacity.Â
|
|
|
|
NFG Dist City Gate - PA
|
NFGDC-PA
|
Delivery Location
|
DPQ
|
430
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
Capacity remaining from Open Season 323
|
|
|
|
Appalachian Production Zone 9
|
AppZn9
|
5
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
12
|
TGP - Wattsburg
|
420075
|
Receipt Location
|
RPQ
|
NFG Dist City Gate - Erie Control
|
NFGDC-ECTL
|
Delivery Location
|
DPQ
|
11,500
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 218.
|
|
|
|
ESNE – Energy Systems North East
|
NOR2702
|
|
|
|
|
|
|
North East Heat & Light
|
NEHLCG
|
Delivery Location
|
DPQ
|
5,930
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
13
|
TGP Z4 Non-Rose Lake
|
TGP4NON RLK/AND
|
Receipt Location
|
RPQ
|
NFG Dist City Gate - PA
|
NFGDC-PA
|
Delivery Location
|
DPQ
|
2,151
|
EFT
|
Currently Avail
|
9:00 AM
|
|
Capacity Remaining from Open Season 230, 234, 274.
|
|
|
|
Capacity Remaining from Open Season 230, 234, 274.
|
|
|
|
14
|
NFGSC Storage
|
NFSTOR
|
Receipt Location
|
RPQ
|
Transco Wharton
|
6325
|
Delivery Location
|
DPQ
|
270
|
EFT
|
Currently Avail
|
9:00 AM
|
10/31/2025
|
9:00 AM
|
Capacity Remaining from Open Season 230. Any capacity
taken with Wharton as a Delivery Point will reduce the total Wharton capacity
available of the total capacity listed in Row 1 and is limited by the meter
capacity. End date posted as part of Non-Critical Notice ID #921538 Reserved
Capacity for Tioga Expansion project.
|
|
|
|
15
|
Appalachian Production Zone 2
|
AppZn2
|
Receipt Location
|
RPQ
|
TGP - Lamont
|
420072
|
Delivery Location
|
DPQ
|
1,595
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 250. Total combined
capacity may not exceed 2,595 dth/d.
|
|
|
|
Appalachian Production Zone 9
|
AppZn9
|
United Refining Corporation
|
UNI2854
|
Delivery Location
|
DPQ
|
1,000
|
EFT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
TGP-Wattsburg
|
420075
|
NFG Dist City Gate - Erie Control
|
NFGDC-ECTL
|
|
|
|
|
|
|
16
|
Diversified Production LLC
|
PSP1U44081
|
Receipt Location
|
RPQ
|
Green Tree Landfill
|
GREENTO
|
Delivery Location
|
DPQ
|
900
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining from Open Season 257 & Open Season
269
|
|
|
|
|
|
Transco - Leidy
|
7126
|
|
|
|
|
Columbia Dutch Hill
|
642643
|
Transco - Wharton
|
6325
|
Firm receipts using the Dutch Hill point will require a
minimum pressure obligation. Any capacity taken with Wharton as a Delivery
Point will reduce the total Wharton capacity available of the total capacity
listed in Row 1 and is limited by the meter capacity. Any capacity subscribed
from this row may reduce the quantity available in row 31.
|
|
|
|
17
|
Green Tree Landfill
|
GREENFROM
|
Receipt Location
|
RPQ
|
NFG Dist City Gate - Island Run
|
NFGDC-IR
|
Delivery Location
|
DPQ
|
200
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining from Open Season 257
|
|
|
|
Green Tree Landfill
|
GREENTO
|
Any capacity taken with Wharton as a Delivery Point will
reduce the total Wharton capacity available of the total capacity listed in
Row 1 and is limited by the meter capacity.
|
|
|
|
Transco - Wharton
|
6325
|
Any capacity subscribed from this row may reduce the
quantity available in row 31.
|
|
|
|
Transco - Leidy
|
7126
|
|
|
|
|
18
|
TGP - Wattsburg
|
420075
|
Receipt Location
|
RPQ
|
NFGDC - Erie Control
|
NFGDC - ECTL
|
Delivery Location
|
DPQ
|
2,500
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining
from Open Season 260
|
|
|
|
|
|
|
|
|
|
Ridgeway MAPP
|
Ridgeway MAPP
|
|
|
|
|
|
|
19
|
TGP - Mercer
|
420069
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
1,168
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Any capacity subscribed from this row may reduce the
quantity available in row 31.
|
|
|
|
|
|
|
|
|
|
20
|
TCPL - Niagara
|
421079
|
Receipt Location
|
RPQ
|
NFGDC - Mineral Springs
|
NFGDC-MSMX
|
Delivery Location
|
DPQ
|
21,699
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 262 and Open Season
314. Any capacity subscribed to NFGDC - MSMX will have a corresponding
reduction to NFGDC - Vick and/or NFGDC - NASH.
|
|
|
|
|
|
|
NFGDC Dist. Vicksburg
|
NFGDC-VICK
|
4,816
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining from Open Season 262. Capacity
subscribed in row 22 has the potential to reduce the capacity available in
rows 1 and 4.Any capacity subscribed to NFGDC - Nash
and/or NFGDC - Vick will have a corresponding reduction to NFGDC - MSMX.
|
|
|
|
NFGDC Dist. Nash Road
|
NFGDC - NASH
|
|
|
|
21
|
TGP - Mercer
|
420069
|
Receipt Location
|
RPQ
|
TETCO - Holbrook
|
70015
|
Delivery Location
|
DPQ
|
21,500
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
|
22
|
Ridgeway MAPP
|
Ridgeway MAPP
|
Receipt Location
|
RPQ
|
TGP - Rose Lake*
|
420527
|
Delivery Location
|
DPQ
|
0
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
*The combined delivery
capacity to Leidy and Rose Lake cannot exceed 4,000 Dth/day.
** Production Receipt at AppZone 2 limited to 900 Dth/d.Â
|
|
|
|
Appalachian Production Zone 8
|
AppZn 8
|
4,000
|
FT/EFT
|
11/1/2024
|
9:00 AM
|
|
|
Firm receipts
using the Dutch Hill point will require a minimum pressure obligation
|
|
|
|
TCO - Dutch Hill
|
642643
|
TGP - Lamont
|
420072
|
6,000
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity through
Rose Lake delivery meters on rows 1, 7, 9, 19 25 and 26 cannot be combined
with capacity through the Rose Lake delivery meter on row 22. Any capacity
subscribed from this row may reduce the quantity available in row 31.
|
|
|
|
|
|
|
|
|
|
Appalachian Production** Zone 2
|
AppZn 2
|
Capacity remaining
from OS263.
|
|
|
|
23
|
Appalachian Production Zone 6
|
AppZn 6
|
Receipt Location
|
RPQ
|
Transco - Leidy
|
7126
|
Delivery Location
|
DPQ
|
20,000
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining
from OS263. End date posted as part of Non-Critical Notice ID #921538
Reserved Capacity for Tioga Expansion project.
|
|
|
|
|
|
|
|
|
|
24
|
Appalachian Production Zone 2
|
AppZn2
|
Receipt Location
|
RPQ
|
United Refining Corporation
|
UNI2854
|
Delivery Location
|
DPQ
|
3,000
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
Capacity remaining from Open Season 272. Any capacity
deducted from Row 24 will be subtracted from rows 29 and 30.
|
|
|
|
Appalachian Production Zone 9
|
AppZn9
|
|
|
|
Ridgeway MAPP
|
RIDGWAY
|
NFG Dist
City Gate - Erie Control
|
NFGDC-ECTL
|
|
|
|
TGP-Wattsburg
|
420075
|
|
|
|
25
|
TGP – Mercer
|
420069
|
Receipt Location
|
RPQ
|
TGP – Lamont
|
420072
|
Delivery Location
|
DPQ
|
4,600
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from OS276. Any capacity subscribed
from Holbrook will reduce total capacity available in row 25. Capacity
through Rose Lake delivery meters on rows 1, 7, 9, 19, 22 and 26 cannot be
combined with capacity through the Rose Lake delivery meter on row 25.                                                                                                                                                                                                                                               Â
             Â
|
|
|
|
Any capacity subscribed from this row may reduce the
quantity available in row 31.
|
|
|
|
Transco – Wharton
|
6325
|
|
|
|
|
AppZone 2 Prod. Meters on Line K
|
Various
|
Transco –Â
Leidy
|
7126
|
 Any capacity taken
with Wharton as a Delivery Point will reduce the total Wharton capacity
available of the total capacity listed in Row 1 and is limited by the meter
capacity.       Â
|
|
|
|
|
|
|
|
NFGDC – Mercer
|
NFGDC – MERC
|
|
|
|
|
TGP – Rose Lake
|
420527
|
|
|
|
|
|
|
|
|
26
|
AppZone 8 Prod. Meters on
Line FM100
|
Various
|
Receipt Location
|
RPQ
|
TGP – Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
4,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining from OS277. Any capacity subscribed to
Leidy will reduce the total capacity available in row 26. Capacity through
Rose Lake delivery meters on rows 1, 7, 9, 19, 22 and 25 cannot be combined
with capacity through the Rose Lake delivery meter on row 26. Any capacity taken with Wharton as a
Delivery Point will reduce the total Wharton capacity available of the total
capacity listed in Row 1 and is limited by the meter capacity. Any capacity
subscribed from this row may reduce the quantity available in row 31.
|
|
|
|
|
TGP – Lamont
|
420072
|
|
|
|
AppZone 2 Prod. Meters on Line K
|
Various
|
Transco – Wharton
|
6325
|
|
|
|
Greentree Landfill – From
|
GREENFROM
|
Transco –Â
Leidy*
|
7126
|
*2,350
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
|
|
|
|
|
|
|
|
|
27
|
TGP – East Aurora
|
420077
|
Receipt Location
|
RPQ
|
Empire – Tuscarora
|
22009010
|
Delivery Location
|
|
3,327
|
FT/ EFT
|
Currently Avail
|
9:00 AM
|
|
|
Any capacity subscribed in row 27Â to Empire - Tuscarora or Millennium
- Independence will reduce rows 7,9,28 offering delivery capacity to Empire - Tuscarora and
Millennium - Independence. Individual producer meters located within the
applicable Appalachian Zone that are equipped with Real Time Measurement,
Communication and Control may be considered as eligible receipt points under
the FT Rate Schedule. Capacity is remaining from OS287. Any capacity taken with Wharton as a
Delivery Point will reduce the total Wharton capacity available of the total
capacity listed in Row 1 and is limited by the meter capacity.
|
|
|
|
|
|
|
TGP – Rose Lake
|
420527
|
|
|
|
Millennium –
Independence
|
2078
|
|
|
|
TRANSCO – Wharton
|
6325
|
|
|
|
28
|
TGP – Mercer
|
420069
|
Receipt Location
|
RPQ
|
Empire – Tuscarora
|
22009010
|
Delivery Location
|
|
4,990
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
|
|
Any capacity subscribed in row 28Â to Empire - Tuscarora or Millennium
- Independence will reduce rows 7,9,27 offering delivery capacity to Empire - Tuscarora and
Millennium - Independence. Individual producer meters located within the
applicable Appalachian Zone that are equipped with Real Time Measurement,
Communication and Control may be considered as eligible receipt points under
the FT Rate Schedule. Capacity is remaining from OS287. Any capacity taken with Wharton as a
Delivery Point will reduce the total Wharton capacity available of the total
capacity listed in Row 1 and is limited by the meter capacity. Any capacity
subscribed from this row may reduce the quantity available in row 31.
|
|
|
|
APPZN2
|
|
|
|
Appalachian
Production Zone 2
|
TGP – Rose Lake
|
420527
|
|
|
|
TGP - Rose Lake
|
420527
|
Millennium –
Independence
|
2078
|
|
|
|
TRANSCO – Wharton
|
6325
|
|
|
|
29
|
TGP - Lamont
|
420072
|
Receipt Location
|
RPQ
|
BG - Greentreen Landfill
|
GREENTO
|
Delivery Location
|
DPQ
|
2,010
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity Remaining from Open Season 295. Any capacity
deducted from Row 29 will be subtracted from rows 24 and 30.
|
|
|
|
|
|
|
30
|
TGP - Lamont
|
420072
|
Receipt Location
|
RPQ
|
United Refining Corporation
|
UNI2854
|
Delivery Location
|
DPQ
|
2,010
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Any capacity subscribed from Row 30 would be subtracted
from Rows 24 and 29
|
|
|
|
|
|
|
31
|
NFG Midstream -
Clermont
|
PSP3104622
|
Receipt Location
|
RPQ
|
TGP - Rose Lake
|
420527
|
Delivery Location
|
DPQ
|
54,282
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2024
|
9:00 AM
|
Any capacity subscribed from row 31 may impact the
capacity offered in rows 16, 17, 19, 22, 25, 26, and 28
|
|
|
|
|
|
|
69,000
|
FT
|
11/1/2024
|
9:00 AM
|
|
|
|
|
|
|
|
|
32
|
Range Resources
|
4111
|
Receipt Location
|
RPQ
|
TETCO - Holbrook
|
70015
|
Delivery Location
|
DPQ
|
300,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 304
|
|
|
|
|
|
|
33
|
TGP - Rose Lake
|
420527
|
Receipt Location
|
RPQ
|
Transco - Leidy
|
7126
|
Delivery Location
|
DPQ
|
50,000
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2025
|
9:00 AM
|
Capacity remaining from Open Season 321. Any capacity
subscribed in this row may impact the capacity being made available in Row 1.
|
|
|
|
34
|
TGP - Lamont
|
420072
|
Receipt Location
|
RPQ
|
Transco - Wharton
|
6325
|
Delivery Location
|
DPQ
|
14,718
|
FT
|
Currently Avail
|
9:00 AM
|
10/31/2025
|
9:00 AM
|
Capacity remaining from Open Season 324. Any capacity
subscribed in this row may impact the capacity being made available in Rows
1, 19, 26, 28, 29, 30, and 31 .
|
|
|
|
|
|
|
35
|
EGTS - Ellisburg
|
41202
|
Receipt Location
|
RPQ
|
Transco - Wharton
|
6325
|
Delivery Location
|
DPQ
|
10,000
|
FT/EFT
|
Currently Avail
|
9:00 AM
|
3/31/2025
|
9:00 AM
|
Capacity remaining from Open Season 332. Any capacity
subscribed in this Row may impact the capacity being made available in Row 1.
Any capacity subscribed inÂ
Row 1Â may impact the
capacity being made available in Row 35
|
|
|
|
|
|
|
TGP-Rose Lake
|
25,000
|
FT/EFT
|
4/1/2025
|
9:00 AM
|
|
|
|
|
|
36
|
TETCO - Holbrook
|
70015
|
Receipt Location
|
RPQ
|
Omnis Baily
|
PSN314668
|
Delivery Location
|
DPQ
|
21,000
|
FT
|
Currently Avail
|
9:00 AM
|
|
|
Capacity remaining from Open Season 338
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Please see Receipt Meter and Delivery Meter Design
Capacity Tables for details regarding individual meter capacities at specific
locations.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loc/QTI:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RPQ- Receipt point(s) quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DPQ- Delivery point(s) quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RDQ- Receipt point(s) to Delivery Point(s) Quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SGQ- Segment(s) quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MLQ- Mainline quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STQ- Storage quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SIQ- Storage injection quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SWQ- Storage withdrawal quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BRQ- Backhaul receipt point(s) quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BDQ- Backhaul delivery point(s) quantity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loc Purp
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MQ- Delivery Location
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IJ- Injection Point
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MV- Mainline
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7S- Pipeline Segment defined by 1 location (or first of 2
locations)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NQ- Pipeline Segment defined by 2 location (or second of
2 locations)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M2- Receipt Location
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SB- Storage Area
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WR- Withdrawal Point
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|